How Much Concrete for a 22-Inch Round Footing 36 Inches Deep?
22″ diameter × 36″ deep round footing: 7.9195 ft³ (0.2933 yd³), exact bag estimates and a 10% planning example.
A 22″ diameter × 36″ deep round footing holds 7.9195 ft³ (0.2933 yd³) of concrete before a placement allowance. Its circular plan area is 2.6398 ft². The quantity is calculated as a straight cylinder, not as a square excavation or a bell-shaped footing.
At 22″ in diameter, this is a wider pier form that deserves planned form bracing, delivery access, and a checked excavation size. At 36 inches, excavation access, spoil handling, and the verified bearing elevation all deserve attention; depth alone does not establish structural suitability. The page estimates material for the dimensions shown; soil bearing, supported loads, reinforcement, frost exposure, and post anchorage are separate design checks. If the actual pier has a widened base or concrete above the stated depth, calculate that additional geometry separately.
Quick Answer
One 22″ diameter × 36″ deep round footing: 7.9195 ft³ (0.2933 yd³) before waste. With a 10% example allowance, the planned volume is 8.7114 ft³ (0.3226 yd³). The appropriate allowance depends on the actual form, excavation and placement conditions.
Base quantities: 27 × 40 lb, 18 × 60 lb, or 14 × 80 lb bags. With 10% extra volume: 30 × 40 lb, 20 × 60 lb, or 15 × 80 lb bags. The calculation assumes mixed yields of 0.30/0.45/0.60 ft³ for 40/60/80 lb bags; check your exact product label.
Need a custom estimate? Use the Footing Calculator, try the concrete yardage calculator for any pour, or browse footing size pages. All project pages.
How to Use This Footing Estimate
Use this sequence to estimate material for the 22″ diameter × 36″ deep geometry. It is not a structural design or a permit guide.
- Check the specified footing: verify that a 22″-diameter, 36″-deep cylinder is shown on the approved plan. Confirm design load, soil bearing, frost exposure, utilities, and the required base elevation.
- Measure the form and cavity: measure the clear inside diameter and actual concrete-filled height. A flared base, irregular excavation, or raised pier extension adds volume beyond the simple cylinder.
- Calculate the concrete volume: use π × radius² × depth, with units converted consistently. This footing needs 7.9195 ft³ before waste; a 10% example makes 8.7114 ft³.
- Combine multiple locations: for 4 identical cylinders, sum the concrete volumes first. The combined amount with 10% extra is 34.8456 ft³, equivalent to 117 × 40 lb, 78 × 60 lb, or 59 × 80 lb bags.
- Plan material handling: one footing with 10% extra needs 15 80 lb bags (approximately 1,200 lb dry). Check access, form bracing, water, mixing rate, and ready-mix availability.
- Place and cure per the design: follow the engineer or local building requirements for preparation, reinforcement, embeds, placement, and consolidation, and the manufacturer’s instructions for mixing and curing.
Formula
Cylindrical footing formula: V = π × radius² × depth. Using inches directly, V (ft³) = 3.1416 × (diameter in inches ÷ 2)² × depth in inches ÷ 1,728.
For this 22″ × 36″ footing: 3.1416 × (22 ÷ 2)² × 36 ÷ 1,728 = 7.9195 ft³. Divide the unrounded result by 27 to obtain 0.2933 yd³. The radius is half the diameter; no radius value is rounded before squaring.
10% example: original volume × 1.10 = 8.7114 ft³ (0.3226 yd³). Apply the extra percentage to cubic feet before converting to whole bags—do not multiply an already-rounded bag count by 1.10.
Worked Example
One 22″ diameter × 36″ deep footing: base volume 7.9195 ft³ (0.2933 yd³). A 10% allowance gives 8.7114 ft³ (0.3226 yd³), requiring 30 × 40 lb, 20 × 60 lb, or 15 × 80 lb bags on the assumed yields.
4 identical round footings: 4 × the unrounded single-pier volume = 31.6778 ft³ (1.1733 yd³). Allow 10% on the combined volume to reach 34.8456 ft³ (1.2906 yd³), then round up once: 117 × 40 lb, 78 × 60 lb, or 59 × 80 lb bags. These totals can differ from multiplying individually rounded bag counts by 4.
Bag Count Estimate
- 15 bags of 80 lb concrete mix
- 20 bags of 60 lb concrete mix
- 30 bags of 40 lb concrete mix
Always verify the actual yield on the product label before buying materials.
Bag Counts by Waste Buffer for 22" diameter × 36" deep
These buffers are examples, not a universal recommendation. The right percentage depends on excavation accuracy, how precisely you measured, soil and ground conditions, and placement losses such as spillage or over-dig. This page uses 10% as its own planning figure.
| Buffer | Volume (ft³) | 80 lb bags | 60 lb bags | 40 lb bags |
|---|---|---|---|---|
| No buffer | 7.92 | 14 | 18 | 27 |
| +5% example | 8.32 | 14 | 19 | 28 |
| +10% example | 8.71 | 15 | 20 | 30 |
| +15% example | 9.11 | 16 | 21 | 31 |
When Bagged Concrete vs Ready-Mix Makes Sense
With a 10% allowance, one footing requires 15 × 80 lb bags—approximately 1,200 lb of dry mix before water. Compare hauling and mixing capacity with a local ready-mix quote; repeat pier locations can turn a moderate single pour into a demanding sequence.
For 4 identical footings, the combined 10%-adjusted volume is 1.2906 yd³ and the one-time rounded bag requirement is 59 bags of 80 lb mix. Ask suppliers about minimum loads, short-load charges, delivery scheduling, form access, and any need for pumping. Concrete volume and bag weight do not establish the bearing capacity of the foundation.
Common Uses for This Footing Size
A 22″-diameter cylinder has a noticeably larger concrete footprint than a narrow sonotube. It may be relevant when estimating a designed pier or column footing, but the larger diameter must not be mistaken for an engineering recommendation.
This 22″ diameter × 36″ deep cylinder has 2.6398 ft² of circular area and requires 7.9195 ft³ of concrete before waste. At an unchanged diameter, extending depth from 24 to 36 inches increases concrete volume by 50%; confirm why that depth is specified before excavation. If the design includes a flared base, bell, enlargement, or above-grade extension, include those separately. Soil conditions, frost requirements, structural loads, reinforcement and anchors require project-specific verification.
Common Mistakes to Avoid
Avoid these calculation and site-planning errors for the 22″ diameter × 36″ deep circular footing:
- Using 22″ as the radius rather than the diameter; the actual radius is 22/2 = 11″.
- Treating a 22″-diameter round hole like a 22″ × 22″ square excavation, which produces a different volume.
- Calculating bags from a rounded 0.29 yd³ display rather than from the full-precision cylinder volume.
- Adding a waste percentage to already-rounded whole bags rather than to concrete volume before bag rounding.
- Assuming a tube form or a straight hole includes the volume of a bell-shaped base or above-grade extension.
- Assuming 36 inches is a universal frost-depth requirement; the appropriate depth and soil conditions are site-specific.
- Failing to verify the actual mix yield, water instructions, form setup and placement continuity for multiple small batches.
Frequently Asked Questions
How much concrete does a 22-inch round footing 36 inches deep need?
A straight cylinder 22 inches in diameter and 36 inches deep contains 7.9195 ft³ (0.2933 yd³) before waste. A 10% planning example is 8.7114 ft³ (0.3226 yd³). Add any bell, flared base or extension separately.
How many 40, 60 or 80 lb bags are needed for a 22″ × 36″ round footing?
Before waste, allow 27 of the 40 lb bags, 18 of the 60 lb bags, or 14 of the 80 lb bags. With 10% extra concrete volume, those totals are 30, 20, and 15 respectively. Assumed bag yields are 0.30, 0.45 and 0.60 ft³; use the yield stated on the actual bag.
How much extra concrete does a 36-inch depth use compared with 24 inches at 22 inches diameter?
At a constant 22-inch diameter, a 24-inch-deep cylinder uses 5.2796 ft³ and the 36-inch version uses 7.9195 ft³. The deeper version uses 50% more material than the 24-inch version, but depth selection depends on site and design requirements.
How many bags are needed for four identical 22″ × 36″ round footings?
Four cylindrical holes total 31.6778 ft³ before waste. With 10% added to their combined volume, plan 34.8456 ft³, or 117 × 40 lb, 78 × 60 lb, or 59 × 80 lb bags. Rounding the combined volume once may differ from multiplying individually rounded whole-bag totals.
Keep Planning Your Concrete Project
Use the calculator, compare more footing pages, and review your estimate before buying materials.
Disclaimer: This page provides planning estimates only. Actual concrete needs vary with excavation accuracy, site conditions, local code requirements, bag yield, and supplier guidance. Always verify measurements before buying materials, and consult a qualified professional for structural or code-sensitive work.