How Many 80 lb Bags for 1.75 Yards of Concrete?
For 1.75 cubic yards of concrete (47.25 ft³), allow 79 80 lb bags before adding any optional waste buffer, based on 0.6 ft³ per bag. A 10% example increases the estimate to 87 bags; the baseline represents 6,320 lb of dry mix, before water. The 1.75-yard estimate is approaching two cubic yards, where repetitive handling and finishing time become major considerations. Confirm the product yield, actual form measurements and placement plan before purchasing.
Choose Your Calculator
Bag Calculator
Adjust volume, bag size, and waste assumptions to get a custom count.
Open Bag CalculatorSlab Calculator
Need to calculate dimensions first? Start with slab size, thickness, and volume.
Open Slab CalculatorLooking for more conversions? Browse all bag pages
Bag Count at a Glance
Bag yield used: 0.6 ft³ per bag. Bag yield guide
Site Notes Before You Buy
For 1.75 cubic yards, the base order is 79 bags of 80 lb (6,320 lb dry mix). A 5% example gives 83 bags; 10% gives 87. Check the printed yield and choose an allowance from actual excavation, forms and handling losses, rather than automatically adding 10%. Ask about pallet quantities, delivery and unloading; compare bulk supplier quotes in cubic yards.
Do not confuse the 1.75 cubic yards concrete volume with the capacity of a vehicle or mixer. Moving 6,320 lb of dry mix may require delivery or multiple legally and safely loaded trips. Keep the quantity decision separate from structural design: thickness, subgrade, joints and loads must be established for the actual project. Never assume bag count alone proves a slab will handle vehicles or equipment.
For a 1.75 cubic yards placement using 79 80 lb bags, plan the finish and curing procedure for the actual mix and weather before opening bags. Keep the water addition within the manufacturer's instructions and avoid long gaps between adjacent placements. Protect the fresh surface from rapid moisture loss and unfavorable temperatures; do not use a fixed 28-day age as automatic approval for heavy loading.
On-Site Pointers for 80 lb Bags
The calculation covers 1.75 cubic yards of placed concrete (47.25 ft³), not a pre-approved slab, footing or repair design. The 1.75-yard estimate is approaching two cubic yards, where repetitive handling and finishing time become major considerations. A staged on-site mixing setup needs adequate equipment and coordination; compare it with ready-mix or another professionally planned delivery option. Thickness, soil support, reinforcement, joints and anticipated loading must be decided for the real application; those requirements cannot be inferred from 79 bags alone.
This option means handling 79 separate 80 lb bags weighing approximately 6,320 lb dry in total, excluding added water, tools and packaging. Using 80 lb bags reduces the number of units but increases the weight per lift; do not assume everyone can move them safely without assistance. Organize the mixing sequence and helpers in advance; a moderate volume can still demand substantial repeated lifting. Confirm the available vehicle payload, delivery access and mixer throughput instead of assuming all materials can arrive or be placed in one trip.
At 79 80 lb bags (6,320 lb dry), compare the total bag purchase and mixer workload with a local ready-mix quote. Bag mixing may be feasible with the right crew, equipment and a continuous placement plan. Delivery minimums, access restrictions and finish timing may matter more than the nominal cost per cubic foot.
Worked Example for 1.75 yards with 80 lb Bags
Step-by-step calculation for this exact volume and bag size:
- Volume in cubic feet: 47.25 ft³ (= 1.750 yd³ × 27)
- Bag yield: 0.6 ft³ per 80 lb bag
- Base count before rounding: 47.25 ÷ 0.6 = 78.75 → round up to 79 bags
- With 10% waste on the volume: (47.25 × 1.10) ÷ 0.6 = 86.63 → round up to 87 bags
- Total weight: 79 × 80 lb = 6,320 lb
Bag Counts by Waste Buffer for 1.75 yards
Pick a buffer based on site conditions: clean forms and accurate volume can run leaner; rough subgrade or hard-to-reach pours need more cushion.
| Buffer | 80 lb bags | Total weight |
|---|---|---|
| No buffer tight pour | 79 | 6,320 lb |
| +5% typical DIY | 83 | 6,640 lb |
| +10% recommended | 87 | 6,960 lb |
| +15% rough conditions | 91 | 7,280 lb |
How Many 40, 60 & 80 lb Bags for 1.75 yards
Same volume, three common bag sizes. Bigger bags mean fewer units to mix but more weight per lift; smaller bags are easier to handle but the count climbs fast.
| Bag size | Bags needed | With 10% waste | Total weight |
|---|---|---|---|
| 80 lb (this page) | 79 | 87 | 6,320 lb |
| 60 lb bags | 105 | 116 | 6,300 lb |
| 40 lb bags | 158 | 174 | 6,320 lb |
Counts use standard yields (0.30 / 0.45 / 0.60 ft³ per 40 / 60 / 80 lb bag) and are rounded up. Confirm the yield printed on your product label before buying.
How to Apply These Numbers On Site
Confirm volume
Start with 1.75 yards and verify whether your total is in cubic feet or cubic yards.
Check bag yield
This page assumes 0.6 ft³ per 80 lb bag.
Add waste
Use the 5% or 10% buffer if you expect spillage, uneven forms, or small measurement errors.
Getting Ready for 79 Bags
When bagged concrete makes sense: smaller pours, simple DIY jobs, and areas where a ready-mix truck is inconvenient.
When to compare ready-mix: once bag counts become very high, delivery may save labor and time. See our concrete cost per yard guide.
Scope check: this is a mid-size pour. Stage your mixing so earlier batches do not set before you finish, and weigh whether ready-mix is easier.
For more tools and conversions, try our concrete yardage calculator or run counts in the bag calculator.
Frequently Asked Questions
What is the 80 lb concrete bag count for 1.75 cubic yards?
Using an assumed yield of 0.6 ft³ per 80 lb bag, divide the measured 47.25 ft³ by 0.6 and round the result up to a whole bag: 79 bags before any waste allowance. That is about 6,320 lb of dry product. The cubic-yard volume converts to cubic feet at 27 ft³ per yard. Check your manufacturer's yield; other mixes can differ.
How much waste allowance should I include for this 1.75 cubic yards estimate?
For 1.75 cubic yards in 80 lb bags, the base estimate is 79 bags. Applying the allowance to the unrounded concrete volume gives 83 bags at +5% and 87 at +10%; a +15% scenario would be 91. These are examples, not a universal recommendation. Select an allowance based on field measurements, uneven subgrade, formwork and likely placement losses, then check the supplier's ordering increments.
What should I plan for when moving 79 bags to the pour area?
The estimated dry bag load is 6,320 lb (79 bags × 80 lb), before adding water or equipment. Using 80 lb bags reduces the number of units but increases the weight per lift; do not assume everyone can move them safely without assistance. Arrange a safe unloading and staging location and check vehicle limits. Organize the mixing sequence and helpers in advance; a moderate volume can still demand substantial repeated lifting. The volume estimate does not specify a safe crew size or mixing rate.
When should I consider ready-mix instead of 80 lb bags for this volume?
The estimate involves 79 80 lb bags, or approximately 6,320 lb of dry material before waste. Bag mixing may be feasible with the right crew, equipment and a continuous placement plan. Ask local suppliers about minimum orders and access, and factor in hauling, mixer capacity, labor and how long placing and finishing will take. Bagged concrete can be viable in some settings, but volume alone cannot determine structural suitability or the best supply method.
Related Guides
How Many Bags of Concrete Do I Need?
Calculating the number of bags of concrete you need depends on your project volume and the bag size you choose. This guide walks you through…
Ready-Mix Ordering Tips: Access, Scheduling & Common Fees
Ordering ready-mix concrete involves more than just calling a supplier and requesting a delivery. Access logistics, timing coordination, site preparation, and understanding typical fees all…
Bagged vs Ready-Mix Concrete Cost: How to Compare
Bagged concrete looks cheaper when you compare price tags at the store. Eighty-pound bags cost a fraction of what ready-mix delivery charges. But price per…
Concrete Curing Basics: Why It Matters & How to Do It – Best Practices
Curing is the single most important factor determining concrete’s long-term durability, surface hardness, and resistance to scaling, dusting, and fine cracking. Yet it’s also the…
Want a Different Volume?
Use our calculators to adjust volume, waste, and bag size for your exact project.