This 18 ft x 20 ft slab is perfect for a patio or gazebo base. Decide between bagged concrete or ready-mix based on your access and volume needs.

PatioHeavy load

Choose Your Calculator

Slab Calculator

Enter any custom length, width, and thickness to get cubic yards and bag counts.

Open Slab Calculator

Bag Calculator

Choose 40/60/80 lb bag sizes and estimate counts for your exact volume.

Open Bag Calculator

Want other sizes? Browse all slab size pages

Quick Answer

Ready-mix needed
6.67 yd³
180.0 ft³
With ~10% waste
7.33 yd³
198.0 ft³
Bag estimate (varies by yield)
80 lb 300 (331 w/ waste) 60 lb 400 (441 w/ waste) 40 lb 600 (661 w/ waste)

Tip: Always confirm the yield printed on your bag label. Bag yield guide

Large pour: consider ready-mix delivery for speed and consistent results. Bag counts this high can take significant mixing time.

Project Notes (Unique)

Ordering tip:

Always round to 0.25 yd³ when ordering and check yield on the label for accurate quantities.

Common mistake to avoid:

Ensure your base is well-prepared and forms are secure, especially for thickened edges to prevent shifting.

Finish & curing:

Apply a smooth finish and keep the surface damp to allow for proper curing without cracking.

Thickness Planning for a 18x20 Concrete Slab

A 6-inch slab gives this patio extra stiffness and tolerance if soil conditions are imperfect or loads may grow over time.

Current spec

This page estimates a 18×20 slab poured at 6 inches.

Load check

Best fit depends on whether this is mainly pedestrian use, storage, or heavier wheel traffic.

Upgrade trigger

If you expect heavier loads later, compare this design against the alternate thickness before ordering.

Subgrade and Form Prep for 18×20

Most slab problems start below the concrete. Keep the base level, compacted, and consistent before you pour.

  • Strip loose topsoil and organic material until you reach firm subgrade.
  • Compact the base in lifts so the 18×20 slab does not settle unevenly.
  • Check form height and diagonal measurements before concrete arrives.
  • Plan reinforcement, joints, and edge support based on the intended patio use.

Worked Example for 18×20 at 6 Inches

Step-by-step calculation for this exact slab:

  1. Convert thickness to feet: 6 ÷ 12 = 0.5000 ft
  2. Compute area: 18 × 20 = 360 sq ft
  3. Volume in cubic feet: 360 × 0.5000 = 180.00 ft³
  4. Convert to cubic yards: 180.00 ÷ 27 = 6.667 yd³
  5. Add 10% waste buffer: 6.667 × 1.10 = 7.333 yd³

Order Planning for a 18x20 Concrete Slab

This slab needs about 6.67 yd³ of concrete, or 300 80 lb bags before waste. With a waste cushion, plan around 7.33 yd³.

For this volume, ready-mix is usually the safer plan. Round up, confirm delivery minimums, and make sure your crew can place and finish the slab without delays.

Adjust dimensions in the slab calculator or compare bag counts here.

Bag Counts by Waste Buffer for 18×20

Pick a buffer based on site conditions: smooth forms and good subgrade can run leaner; uneven excavation or hard-to-reach pours need more cushion.

BufferYards (yd³)80 lb bags60 lb bags40 lb bags
+5% tight pour7.00315420630
+10% typical7.33331441661
+15% rough subgrade7.67345460690

What to Expect After Pouring This patio

Protect the slab after finishing, keep the surface from drying too fast, and avoid heavy service until the concrete has had time to gain strength.

First 24 hours

Protect edges, prevent washout, and avoid unnecessary traffic while the slab sets.

Days 2-7

Maintain curing conditions and monitor joints, surface drying, and weather exposure.

Up to 28 days

Concrete keeps gaining strength, so wait for the right service window before heavy use.

How to Estimate This Slab in 3 Steps

1

Measure

Length 18 ft, width 20 ft, thickness 6 in.

2

Compute Volume

Area: 360 sq ft → volume: 180.0 ft³6.67 yd³.

3

Add Waste

Add a small buffer for spillage and uneven subgrade, then round up when ordering.

Planning Notes

Common uses: patio, gazebo base, walkway section.

For more context and conversions, see the Concrete Calculator hub.

Frequently Asked Questions

What should I consider when choosing between bags and ready-mix concrete?

Consider your project's scale, access to the site, and whether you have the means to mix on-site or prefer delivered ready-mix.

How do I determine the right thickness for my slab?

The thickness should be based on the intended use; heavier loads may require greater thickness for stability.

What is the best way to prepare the base for my concrete slab?

Excavate to a suitable depth, ensuring it's level and compacted to prevent settling after pouring.

How can I minimize waste when ordering concrete?

Estimate your needs carefully and add a buffer for spills or over-excavation, rounding your order up as necessary.

Related Slab Sizes

Ready to Calculate Your Project?

Get instant estimates for cubic yards, cubic feet, and bag counts. No signup required.

Disclaimer: Estimates only. Verify measurements, thickness, site conditions, and bag yield with your supplier. For structural work, consult a professional.

Leave a Reply

Your email address will not be published. Required fields are marked *